PRE-BID MEETING: 9:00 AM, Thursday, October 19, 2017
SEALED BIDS DUE: 3:00 PM, Thursday, October 26, 2017
Sealed proposals are being accepted for the Town of Bridgton Survey and Reconstruction Drawings for Lower Main Street (the “Project”), which consists of obtaining competitive bids from responsible and responsive Contractors to conduct a right-of-way survey, and produce design and shovel-ready reconstruction drawings for a roughly 1-mile segment of Lower Main Street. Right-of-way design will include sidewalks, storm drains, shade trees, sewer line stubs to side streets, and consideration of CMP pole relocation.
A pre-bid meeting will be held on October 19, 2017 9:00 AM at the Town Office 3 Chase St, Suite 1, Bridgton, ME 04009.
Complete written bids shall be submitted in sealed envelopes plainly marked, “Lower Main Street Project” to: Brenda Day, Administrative Assistant 3 Chase Street Bridgton, ME 04009 no later than 3:00 PM Thursday October 26, 2017, at which time the bids will be publicly opened and read aloud. Contract bid documents, including plans and specifications, are available on the Town website(https://bridgtonmaine.org) or by e-mail request to Brenda Day (bday@bridgtonmaine.org).