At this time residents can expect that the roads will remain unpaved for at least the next several weeks. Sargent plans to come back through and pave each road once the sewer has been completed on multiple streets. In the areas where the water and sewer work is being done, the road will not be paved until both water and sewer work is completed.
Areas that have ongoing sewer work are: Harrison Road, Iredale Street, and Chase Street
Area that has ongoing water main work is: Walker Street, Fowler Street, and Gage Street
A field engineer from Woodard and Curran will be going around to each house to confirm the proposed sewer lateral location with the property owner so please be on the look-out for them.
Click here to view the PDF Version of Map Updates for 07.05-07.16